KOREAN   |   ENGLISH 

  Market & Policy  |   Project & Contract  |   Technology & Product  |   Corporate News  |   Product News  |
  Cell & Module  |   Production & Inspection  |   Component & Power  |   Solar Material  |
  Worldwide  |   Europe  |   North America  |   APAC  |   Others  |
  Cell & Module  |   Production & Inspection  |   Component & Power  |   Solar Material  |
  Cell & Module  |   Production & Inspection  |   Component & Power  |   Solar Material  |   Agent & Dealer  |
  Free Event Listing
  2012 JUN Issue   |   What is Digital Magazine?  |  How to use  |  Archives  |  Subscription  |  iPad / Mobile  
 
  Tigo Energy

20% More Energy

Market & Policy

Project & Contract

Technology & Product

Corporate News

Product News


<JUN, Issue, 2012>
Cover Story :
DEGER equips two solar parks in Bosnia-H...
Table of
  Contents
Corporate News

Home > News > Corporate News

Solar power system adorns Berlin¡¯s Rotes Rathaus

Wowereit inaugurates CENTROSOLAR GROUP¡¯s third prestigious project in Berlin

Inauguration of the solar power system on the roof of Rotes Rathaus: from left to right: Michael Gei©¬ler (MD of Berliner Energieagentur), David Miller (Mayor of Toronto), Klaus Wowereit (Mayor of Berlin), Katrin Lompscher (Senator for the Environment, Berlin). Source: Gust/Berliner Energieagentur

 

Climate protection takes top priority in Berlin-- and Centrosolar AG has once again helped to confirm this image. Last week, Berlin¡¯s Mayor Klaus Wowereit inaugurated a 38 kWp solar power system built with CENTROSOLAR modules on top of Rotes Rathaus in Berlin. The system on the roof of the city hall, which houses not only the mayor but also the Senate of Berlin, is clearly visible from the adjacent Fernsehturm. It serves as a further clear sign of Berlin¡¯s commitment to climate protection. 

The solar power system was planned and installed by Centrosolar ¡¯s Centroplan subsidiary on behalf of Berliner Energieagentur which operates the system. In less than two weeks, 160 modules were installed on the city hall roof. The crystalline high-performance modules type S Class Professional were installed on the flat roof at a 15 degree angle facing south. ¡°We are pleased that Berliner Energieagentur decided in favour of German quality modules for this prestigious project. Centrosolar modules are manufactured at the solar power plant in Wismar according to the highest quality standards,¡± reports Thomas Güntzer, the Centrosolar ¡®s project business director. Covering an area of 263 m©÷, the system has a total output of 38.4 kWp and is expected to generate an annual yield of 36 MWh. Over 23 tonnes of carbon dioxide will thus be saved per year.

It is not only the landmark character of the building that makes this solar power system special. It also illustrates that photovoltaic systems can be installed on protected buildings, such as the city hall. The historic character of the building erected in 1861 is not affected by the solar power system as the panels are invisible from the street below.  

The Rotes Rathaus solar power system is the third project implemented by the CENTROSOLAR on behalf of Berliner Energieagentur. As recently as January of this year, a 250 kWp system with Centrosolar modules was taken into operation on the Max-Schmeling-Halle in Berlin. Further projects are in the pipeline.    

 

 

Further Information: Centrosolar AG (www.Centrosolar.com)

 

 

For more information, please send your e-mails to pved@infothe.com.

© www.interpv.net All rights reserved

 

 

 

 

 
 

     Trina Solar ranked top 2 in worldwide PV industry

     SunPods Demonstrates Plug ¡®N Go Solar Car Charging Station to the U.S. Army



Portable solar ...
Polyurethane fo...
Wire Bonding Ma...
Home l New Product Showcase l Gold Suppliers l Trade Shows l email Newsletter l About InterPV l Help l Site Map l Partnerships l Privacy Policy
Publisher: Choi Jung-sik | Edited by: Lee Sang-yul | Youth Protection Officer: Lee Sang-yul
Copyright Notice ¨Ï 2004-2007 www.interpv.net Corporation and its licensors. All rights reserved.